Pages

Aug 11, 2013

Clearing our walking path at the August workday

Presenting the new footpath on the south side of the park, heading west toward Masonic:  


It's like the old path, but it's about 20 percent wider. You've got more room for walking or jogging, and hopefully fewer mud puddles. That's because our volunteers yesterday scraped up and removed several feet of soil that was encroaching on the path. 

Wouldn't it have been great to do that for the entire length of the path? Absolutely, but that will take a bigger volunteer turnout. Imagine how heavy it is to lift the damp, compacted soil. We were a strong group of volunteers, but an hour of that work meant sore shoulders and back (for me, anyway). 
The sun came out during break time at the memorial

In addition to pathway clearing, we tended to a half-dozen smaller jobs in the east end, like weeding around the trees along Baker Street, removing ivy climbing a eucalyptus, and trimming back the enormous shrub that grows into the bike path close to Baker. 



During the mid-summer, the combination of irrigation, fog drip, and increased solar energy makes the Panhandle a bright green oasis. Get out and enjoy it, with or without blue skies.

2 comments:

  1. I'm always up for more path widening. Maybe I need to recruit more strong backed volunteers!

    ReplyDelete
  2. I'm always up for more path widening. Maybe I need to recruit more strong backed volunteers!

    ReplyDelete